Hydraulic Kit No. TKI74-A00-HYD Installation
1. Fastener BOM
Tools required
- 19 Spanner
Step 1
Assemble hydraulic adaptors onto shutoff valve.
Step 2
Ensure the bulkhead is to the opposite side to the lever when opened.
Step 3
Remove Hose 1 from block C2 the gripper cylinder (push).
Step 4
Secure shutoff valve to vertical brace profile by placing bulkhead into to the 14mm hole located towards the top side.
Step 5
Hose 1
Connect hose 1, 90 coupling to bulkhead and place the opposite 90 coupling onto C2 on the block.
Connect hose 1, 90 coupling to bulkhead and place the opposite 90 coupling onto C2 on the block.
Step 6
Hose 2
Place the 90 coupling from hose 2 onto the shutoff valve and connect the straight coupling onto the gripper cylinder (push).
Place the 90 coupling from hose 2 onto the shutoff valve and connect the straight coupling onto the gripper cylinder (push).